A preliminary budget has been prepared for the all weather track rennovation. As you can see, there are some high cost items, the major expenses being the rubber track surface and the asphalt paving that goes under it. Actual costs may vary and will depend on contractor bid costs. Some expenses, such as demolition and drainage costs my be reduced if we can get help from volunteer labor.

High School Stadium Improvements
Preliminary Cost Analysis For Budget Purposes
Item

 Cost

 Drainage Improvements

 40K

 Demolition

 10K

 Concrete Walks, Ramps, Etc.

 30K

 Track Surface, (1/2" polyurethane, red color)

 125K

 AC Track (Asphalt)

 50K

 Water Fountains

 5K

 Sand Pits

 4K

 Irrigation Improvements

 1K

 Electrical Improvements

 1K

 Landscaping

 5K

 Fencing

 12K

 Monument Wall

 10K

 Total (red color)

 293K

   
 Optional green color for track surface

 12K

 Total (green color)

 305K

 